-
October 16, 2018
Over the past 10 years, TOBIN has acted as Lead Consultant to Connacht Rugby over a number of redevelopment projects across 5 different phases including: •New Floodlight for main pitch and training area •Clan Stand and Grant Thornton Stands •Terrace …
-
August 7, 2018
TOBIN acted as Lead Consultant of the multi-disciplinary team providing full PSDP services throughout this project. The arena is designed as both a High-Performance Training Centre for equestrian sport as well as being a facility that can be rented b …
-
August 7, 2018
The facility is a single-storey building and consists of an Indoor Training Area including a 4-lane 130-metre running track with performance analysis facilities, a dedicated boxing gym consisting of 4 training rings and one full-size competition ring …
-
August 7, 2018
The National Sports Campus multi-sport pitches hub caters for soccer, Gaelic football, hurling, rugby, and hockey, and is open to the public on a ‘pay-to-play’ basis throughout the year. The workload on this multi-pitch sports hub project included fo …
-
August 7, 2018
TOBIN Consulting Engineers was the Lead Consultant for Sport Ireland’s National Sports Campus ‘Campus Conference Centre’ (CCC) project. This new CCC building now serves as a centrally located outlet for administrative, business and social activities …
-
August 7, 2018
TOBIN Consulting Engineers was delighted to come on board with the Connacht GAA Council in recent years to design a new Centre of Excellence for the province in Bekan, Co. Mayo. This strategically positioned development, at the geographical centre po …
-
August 7, 2018
The first phase of this project comprised of the construction of a full size floodlit 4G synthetic pitch with two ‘cross play’ multi-use pitch options complete with fencing, ball-stop netting and hurling wall. Other elements included a significant re …
-
February 23, 2018
Works included the construction of a new extension to the existing National School at Oranmore, Co. Galway. The civil and structural engineering works comprised of site development work, construction of the new school extension, installation of new f …
-
February 23, 2018
This project comprised of the demolition of the existing school and the construction of a new 8 classroom school on the same site. The civil & structural engineering works included: Diversion of existing underground culvert/drain around the new s …