• March 24, 2025

    TOBIN provided Civil & Structural Engineering services for the delivery of the new €2.8 million Athenry Fire Station. Officially opened on November 15th, 2024, by Minister of State Anne Rabbitte TD and Cathaoirleach of Galway County Councillor Al …

  • March 24, 2025

    Aligning with Galway’s designation as the European Region of Gastronomy in 2018, the TOBIN-led BIA Innovator Campus was approved for development in Athenry, Co. Galway. TOBIN worked closely with the BIA Innovator Campus CLG Board to provide high-qual …

  • February 21, 2025

    The project involves the demolition of an existing stone shed structure and the construction of 151 residential units, comprising a mix of houses, duplex units, and apartment units. In addition to the residential development, the project includes the …

  • February 18, 2025

    The proposed development involves the clearance of a greenfield site to facilitate the construction of a two-story factory with a total gross floor area (GFA) of 3,400 square meters. The project includes the development of an access road, landscaping …

  • January 28, 2025

    TOBIN is proud to provide PSDP and safety consultancy services to Dublin City Council for the upgrade of the Lord Mayor’s private self-contained residence on the 1st floor of the Mansion House on Dawson St, Dublin 2. The Mansion House is of internati …

  • January 28, 2025

    The Cathedral of the Assumption was built in 1827 – 37 on a hill overlooking Tuam and was the second Roman Catholic Cathedral (after Newry) to be built in Ireland after Catholic Emancipation. The building is built of limestone with buttresses, elabor …

  • January 28, 2025

    TOBIN were appointed as Assigned Certifier, Civil and Structural Design Engineers and PSDP for the restoration and refurbishment of the existing Former Engine Station building located at Ceannt Station, Galway to be used as a modern office space by I …

  • January 23, 2025

    TOBIN played a pivotal role in the construction of a residential development on Cappagh Road, Galway, for Alber Homes. This project encompassed the creation of 42 units, comprising: 22 modern 3 and 4-bedroom houses 20 versatile 1, 2, and 3-bedroom ap …

  • December 9, 2024

    TOBIN were involved in the refurbishment of Ballintubber Abbey. The work involved a detailed survey of the Chapter House and 14th century doorway at Ballintubber Abbey, with a structural assessment of the capacity of the Chapter House walls to accept …

Start typing and press Enter to search