• July 5, 2021

    The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor …

  • July 4, 2021

    This entire development totals approximately 24,756sq.ft and includes courtyards, offices, residential and retail space. TOBIN Consulting Engineer acted as Employer’s Representative, preparing contract documents including the design of all civil, str …

  • July 4, 2021

    This building, originally completed in 2002, was designed to a high architectural standard to function as a passively cooled and ventilated atrium office building. However, during its occupancy the building tenants experienced significant issues of s …

  • Hibernian House - Eyre Square Galway
    July 4, 2021

    Hibernian House was constructed in 1850 and stands with a distinctive limestone façade on the northern side of Eyre Square. TOBIN Consulting Engineers was proud to provide Project Management, Engineering and Design Consultancy services for the refurb …

  • July 3, 2021

    The Mick Lally Theatre is located along Courthouse Lane in Galway City. Part of Galway’s old city walls, which are protected, run through the Theatre. The works involved: Forming new opes in existing walls Forming an internal floor slab incorporating …

  • June 21, 2021

    This project comprised of the construction of 61 residential units consisting of a mixture of houses, apartments and a creche. The development is located along the coastline of Galway Bay and positioned between the village of Oranmore and the City of …

  • June 9, 2021

    This project involved the complete refurbishment and fire upgrade works of a small office unit (130m²) located in the Old Terminal Building of Shannon Airport. TOBIN were responsible for the detailed assessment of the existing unit to identify the re …

  • June 8, 2021

    TOBIN had responsibility for the Design from Planning Stage through to completion of all Civil and Structural works for this Primary Healthcare Building in Galway. Developed in 2008, the Faustino Building is a two-storey over double basement building …

  • May 22, 2021

    This project involved the initial inspection of 145 residential units in Nenagh, Co. Tipperary. Remedial works as identified by TOBIN Consulting Engineers were carried out on all units. As PSDP, TOBIN  liaised with the temporary works designers and a …

Start typing and press Enter to search