• July 15, 2021

    TOBIN is proud to have delivered the world’s largest Sports Air Dome for Connacht GAA in Bekan, Co. Mayo. The Smart Air Dome is located on the site of the Connacht GAA ‘Centre of Excellence’ and measures 150m (l) x 100m (w) x 26m (h). This highspec f …

  • July 6, 2021

    TOBIN Consulting Engineers provided Project Management, Specialist Sports Facility Design, Civil and Structural Engineering, Quantity Surveying and PSDP Services on the Sports Campus Pavilion project, as well as acting as Employer’s Representative fr …

  • July 6, 2021

    This state-of-the-art facility included the development of three individual areas: The National Indoor Training Centre, the National Gymnastics Training Centre and the National Indoor Athletics Training Centre. This fully accessible, multi-sport and …

  • July 5, 2021

    The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor …

  • June 13, 2020

    TOBIN partners with the GAA for Connacht Centre of Excellence. TOBIN provided multidisciplinary services for this state-of-the-art facility for Connacht GAA where works were completed over 3 separate phases. Phase 1 included the construction of 5 san …

  • March 25, 2020

    Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site ser …

  • March 25, 2020

    This state-of-the-art National Games Development Centre is located in the National Sports Campus in Dublin. This nationally important project for the GAA includes a total of 5 playing pitches, four of which are full size with floodlighting, a 3G synt …

  • March 24, 2020

    TOBIN Consulting Engineers provided a number of services on this redevelopment project for Emerald Grounds. A brand new 1,960- seater stand was constructed as well as a new training area complete with floodlights, four dressing rooms, referees’ rooms …

  • June 6, 2019

    TOBIN Consulting Engineers acted as Lead Consultant for IT Carlow on the delivery of the new 31-acre South Sports Campus Development. Phase 1 of this world-class outdoor training facility consisted of the delivery of six full-size playing pitches, co …