At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Water & Utilities, Building & Infrastructure, Environment & Planning and Roads and Transportation sectors.

  • glenbeg water treatment plant
    February 26, 2020

    The Glenbeg Water Treatment Plant is designed to treat up to 3,000m3 of water per day.  The plant is located on the western shore of Glenbeg Lough on the Beara Peninsula, Co. Cork, and supplies treated water to Castletownbere and its environs, includ …

  • lough mask
    February 26, 2020

    A Water Order secured under the 1942 Water Supplies Act gave the right to abstract up to 54,145m3 of water per day from Lough Mask. The phased development involved the provision of a supply connection to Westport Town from the Lough Mask Regional Wat …

  • longford central
    February 26, 2020

    Over the course of the Longford Central RWSS scheme, two works contract were carried out which significantly improved the existing water treatment and water supply infrastructure. The first contract that was carried out involved the improvement of wa …

  • grid west
    February 26, 2020

    The Grid West Project is part of the National Grid 25 Programme. The 400kV scheme will form part of the electrical network necessary to connect an estimated 5,000MW of renewable energy resources available in the West of Ireland, as well as meeting th …

  • groundwater protection
    February 26, 2020

    This project forms a fundamental element in catchment management. It makes sense to know where our water is coming from, particularly water for human consumption. The areas defined as source protection zones around public supply boreholes and springs …

  • costelloe
    February 26, 2020

    The Costelloe Regional Water Supply Scheme was procured in two contracts, a DBO contract for the lake impoundment, abstraction works and treatment (Contract 3), and an Employer Design contract for pipelines and reservoirs (Contract 2).  Contract 2 co …

  • westmeath
    February 26, 2020

    The Westmeath Water Conservation Project entailed a 3 stage approach to tackling the issue of unaccounted for water (UFW). Stage 1 involved putting Water Management Systems in place, District Meter Areas, to quantify the extent of the problem and sys …

  • letterkenny hospital
    February 26, 2020

    In July 2013, following intense rainfall in the area, flooding occurred in parts of Letterkenny General Hospital. The source of the flood water was a local stream known as the Sprackburn Tributary (a tributary of the River Swilly), which runs towards …

  • lough atalia bridge
    February 26, 2020

    The Lough Atalia Road passes under a low 19th Century bridge.  The bridge is comprised of cast iron arches and it is a protected structure. It is proposed to lower the road under the bridge to provide additional clearance for high-sided vehicles to s …